September 2016

22

The Ductless Equipment Engineering Committee met to discuss DOE SNOPR comments.


The ERV Engineering Committee met to update AHRI Standard 1060 to incorporate a performance map.


The Chillers Engineering Committee and Lab Subcommittee met at Intertek in Cortland, N.Y., to provide training to Intertek staff on AHRI Standards 550/590 and 551/591.


21

The WSHP Compliance Committee met for its quarterly meeting.


The Chillers Engineering Committee and Lab Subcommittee met at Intertek in Cortland, N.Y., to provide training to Intertek staff on AHRI Standards 550/590 and 551/591.


The HI Technical Committee met to discuss gas-fired boiler related topics.

  • Contact Tae Kwon for more information.

The SPC 210 Working Group - Defrost met to begin discussing a work plan and schedule.


20

The Furnace Engineering Committee met to discuss EPA furnace regulations, the FER test procedure, and AHRI's research on low-return air temperatures.


19

The WICF Engineering Committee and Refrigerant Regulatory Committee met to discuss the recent DOE meeting and the WICF TP.


The SPC 210 Working Group - Off Cycle Power Consumption met to begin discussing a work plan and schedule.


The SPC 210 Working Group - Variable Capacity met on September 19 to begin discussing a work plan and schedule.


16

The ULE Engineering Committee met to review AHRI Standard 340/360, the new IEER metric, and DOE's Enforcement Policy Statement.


The ACIM Engineering Committee met to discuss ENERGY STAR certification and AHRI Standard 820.


15

The ERV Software Working Group met to discuss the timeline to complete tasks for the software project.


The SPVU Compliance Committee met for its quarterly meeting.


The Furnace Compliance Committee met to discuss gap analysis, and review the Furnace certification programs' statuses and revisions to the RFRN and CFRN Operations Manuals.


14

The Boiler Compliance Committee met to discuss proposed testing guidelines in the RBLR Operations Manual.

  • Contact Tae Kwon for more information.

12

The Furnace Engineering Committee met to discuss EPA furnace regulations, the FER test procedure, and AHRI's research on low-return air temperatures.


9

The Joint WH/HI High Altitude Working Group met to complete the CSA Proposal for High Altitude.

  • Contact Tae Kwon for more information.

8

The Compressor Engineering Committee met in Atlanta, Ga., to finalize AHRI Standard 545P.


The CRR Product Section met to discuss the impact of the OSHA response.


7

The Ductless Equipment Product Section met to discuss the transition plan for multi-split systems.


The VRF Compliance Committee met to discuss gap analysis between VRF certification program governing documents and DOE CFR documents.


6

The RFC Engineering Committee met to discuss AHRI Standard 440.


The RFC Compliance Committee met to review updates to AHRI Standard 440 and revisions to the RFC Operations Manual.


The Chillers Engineering Committee and Lab Subcommittee met to finalize the presentation on revised rating requirements and method of test in AHRI Standards 550/590 and 551/591.

 


2

The Furnace Lab Subcommittee met to discuss RFRN proposed testing guidelines.


The Burners Biodiesel Subcommittee met to discuss high biodiesel blends of fuel oils.


1

The WH Technical Committee and Regulatory & Policy Committee met to discuss the DOE conversion factor SNOPR.


The DGX Engineering and Compliance Committees met to discuss implementing AHRI Standard 870.


ERV Uncertainty Working Group.


August 2016

31

The ERV Compliance Committee met to update the ERV Operations Manual.


The HI Technical Committee met to review certification activities and CBLR NOPR testing analysis.

  • Contact Tae Kwon for more information.

29

The Compressor Performance Uncertainties Working Group met to continue work on the Compressor Performance Uncertainties white paper.


The Humidifiers Engineering Committee met to discuss AHRI Standard 640.


26

The ACIM Compliance Committee met to discuss gap and risk analysis, and certification program restructuring.


The Guideline V Subcommittee met to continue revising Guideline V.


25

The ERV Engineering Committee met to update AHRI Standard 1060.


24

The Standard 1060 Working Group met to continue discussing the range of standard rating conditions.


The WH Technical Committee and Regulatory & Policy Committee met at AHRI headquarters in Arlington, Va., to develop comments on the DOE NOPR to revise standards on commercial water heating equipment.


23

The Ductless Equipment Engineering Committee's Technical Committee met at AHRI headquarters in Arlington, Va., to review AHRI Standard 1230.


The RFC Engineering Committee met to discuss AHRI Standard 440.


The RFC Compliance Committee met to review correlation data from the lab and discuss future updates to the RFC Operations Manual.


22

The Standard 1520P Working Group met to being work on AHRI Standard 1520P for centrifugal compressors.


The Ductless Equipment Engineering Committee's Technical Committee met on at AHRI headquarters in Arlington, Va., to review AHRI Standard 1230.


The LLHE Compliance Committee met to discuss possibly expanding the scope of the LLHE certification program to include glycols.


The WICF Engineering Committee met to review the recent WICF test procedure update from DOE and some outstanding items for ASHRAE SPC 210.


19

The Liquid Chillers Product Section met to discuss GMPI testing and create a strategy for the globalization of AHRI Standards 550/590 and 551/591.


18

The Boiler Compliance Committee met to review the RBLR Operations Manual and finalize gap analysis.

  • Contact Tae Kwon for more information.

The Compressor Engineering Committee met to finalize AHRI Standard 545P.


17

The ERV Compliance Committee met to update the ERV Operations Manual.


16

The VFD Compliance Task Force met to discuss basic model group definition.


The Burners Biodiesel Subcommittee met to discuss high biodiesel blends of fuel oils.


15

The Joint WH/HI High Altitude Working Group met to discuss the high altitude proposal.

  • Contact Tae Kwon for more information.

The VRF Compliance Committee met to conduct gap analysis between the VRF program and DOE CFR.


12

The Guideline V Subcommittee met to continue revising AHRI Guideline V.


11

The ERV Engineering Committee met to revise AHRI Standard 1060.


10

The SPVU Engineering Committee met to continue revising AHRI Standards 390 and 391.


8

The Compressor Performance Uncertainties Working Group met to continue work on the white paper.


5

The Ductless Equipment Engineering Committee Technical Committee met at AHRI headquarters in Arlington, Va., to continue revising AHRI Standard 1230.


The UVNT Subsection met to discuss how to proceed with various regulated primary equipment types within the certification program.


4

The Ductless Equipment Engineering Committee Technical Committee met at AHRI headquarters in Arlington, Va., to continue revising AHRI Standard 1230.


3

The ERV Compliance Committee met to update the ERV Operations Manual.


The SPVU Engineering Committee met for its bimonthly meetings to address standards work and outstanding items.


1

The Compressor Engineering Committee met to discuss AHRI Standard 545P.


July 2016

28

The Humidifiers Engineering Committee met to discuss AHRI Standard 640.


The ERV Engineering Committee met to discuss AHRI Standards 1060 and 1061.


27

The VRF Compliance Committee met to conduct gap analysis between the VRF certification program and DOE CFR.


26

The ERV Uncertainty Working Group met to discuss uncertainty across the performance map.


The ASHRAE 205 Working Group of the ERV Engineering Committee met to discuss ASHRAE 205.


25

The Standard 1520P Working Group met to begin work on AHRI Standard 1520P for centrifugal compressors.


The AHU Subsection met to discuss the trademark for fan arrays.


22

The ERV Engineering Committee met to review draft certified rating boundaries and minimum required rating data.


The Ductless Equipment Product Section met to compile comments on DOE final rule for residential CAC/HP.


21

The AHU Engineering Committee met to revise AHRI Standards 430 and 431.


20

The ERV Compliance Committee met to update the ERV Operations Manual.


The ACHC 410 Working Group met to revise AHRI Standards 410 and 411.


The USE Engineering Committee met at AHRI headquarters in Arlington, Va., to revise AHRI Standard 210/240.


19

The USE Engineering Committee met at AHRI headquarters in Arlington, Va., to revise AHRI Standard 210/240.


The Radiation Engineering Committee met to draft AHRI Standard 1410P.

  • Contact Tae Kwon for more information.

The CRR Product Section met to discuss a long-term educational outreach plan for the industry on Guideline N changes.


The TCoS 260 Subcommittee met to discuss AHRI Standards 260 and 261.


18

The Ductless Equipment Engineering Committee Technical Committee met at AHRI headquarters in Arlington, Va., to revise AHRI Standard 1230.


The Compressor Performance Uncertainties Working Group met to continue work on the compressor performance uncertainties white paper.


15

The Ductless Equipment Engineering Committee Technical Committee met to revise AHRI Standard 1230.


The ERV Guidance Steering Committee met to discuss software planning.


14

The SPVU Engineering Committee met to discuss AHRI Standards 390 and 391.


The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.


The ERV Engineering Committee met to discuss AHRI Standards 1060 and 1061.


13

The ASHRAE 205 Working Group of the ERV Engineering Committee met to discuss ASHRAE Standard 205.


12

The RFC Engineering Committee met to discuss AHRI Standard 440.


The TCoS 575 Subcommittee met to discuss AHRI Standards 575 and 261.



8

The AHU Sound Certification Working Group met to hold its first meeting.


7

The Guideline V Subcommittee met to revise Guideline V.


6

The ERV Compliance Committee met to update the ERV Operations Manual.


The 410 Working Group met to revise AHRI Standards 410 and 411.


The ASHRAE 205 Working Group of the ERV Engineering Committee met to discuss ASHRAE 205.


June 2016

30

The Packaged Terminal Engineering Committee met for its bimonthly meeting to address standards work and outstanding items.


28

The Standard 700 Subcommittee Working Group met to discuss chromatographs.


24

The ACIM Compliance Committee met to discuss certification activities.


23

The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.

 


22

The ERV Compliance Committee met to update the ERV Operations Manual.


The VRF Regulatory Working Group met to discuss CEC CBECC-Com Title 24 software.


The VRF Compliance Committee met to discuss VRF regional laboratory correlation testing.


20

The AHUC Engineering Committee met to review a potential addendum to AHRI Standards 1350 and 1351.


17

The Ductless Equipment Product Section met to review the DOE final rule for residential CAC/HP.


16

The Compressors Performance Uncertainties Working Group met to continue work on the compressor performance uncertainties white paper.


The SPVU Compliance Committee met for its quarterly meeting.


The ERV Engineering Committee met to discuss AHRI Standards 1060 and 1061.


The DC Product Section met to assess certification test procedures and the DCOM Operations Manual.


15

The USE Engineering Committee Ad Hoc Fault Code Committee met to work on a numbering scheme to reduce the list of faults.


The WSHP Compliance Committee met for its quarterly meeting.


The 410 Working Group met to discuss revisions to AHRI Standard 410.


14

The Ductless Equipment Engineering Committee Technical Committee met to review AHRI Standard 1230.


The ERV Uncertainty Working Group met to discuss uncertainty across the performance map.


The Compressors Engineering Committee met to discuss AHRI Standard 545P.


13

Furnace Compliance Committee.


10

The ACHC Compliance Committee met to discuss zero checks and ACFM/SCFM.


9

Furnace Engineering Committee.


The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.


8

The Packaged Terminal Compliance Committee met for its quarterly meeting.


The ERV Compliance Committee met to update the ERV Operations Manual.


The VRF Regulatory Working Group met to discuss CEC CBECC-Com Title 24 software.


7

The WH Technical Committee and Regulatory & Policy Committee met at AHRI headquarters to discuss DOE's proposed rules to revise CWH test procedures and energy conservation standards.


The CRR Product Section met to discuss the EPA SNAP proposed rulemaking.


6

The AHU Compliance Committee met to discuss custom units.


The FCCP Engineering Committee met to discuss AHRI Standards 750 and 751.


The ERV Engineering Committee Working Group met to address the Systems Steering Committee task to finalize inputs and outputs for the appendix of draft ASHRAE Standard 205.


The Humidifiers Engineering Committee met to discuss AHRI Standard 640.


2

CBLR DOE Standards Working Group.


The ERV Engineering Committee met to discuss AHRI Standards 1060 and 1061.

1

The Wind Task Force met to work on AHRI Standard 1310P.
May 2016

31

Furnace Lab Subcommittee.


26

The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.


The WH Technical Committee and Regulatory & Policy Committee met to discuss DOE's proposed rules to revise CWH test procedures and energy conservation standards.


The AHUC Engineering Committee and OM Working Group met to discuss pressures for deflection and leakage.


25

ULE Compliance Committee.


The ERV Compliance Committee met to update the ERV Operations Manual.

 


24

The Ductless Equipment Engineering Committee Technical Committee met at AHRI headquarters to discuss AHRI Standard 1230.


23

The USE Engineering Committee Ad Hoc Fault Code Committee met to continue work on developing the draft fault code list.


The Ductless Equipment Engineering Committee Technical Committee met at AHRI headquarters to discuss AHRI Standard 1230.


19

The ERV Engineering Committee met to discuss AHRI Standards 1060 and 1061.


18

The VRF Compliance Committee met to discuss gap analysis and risk assessment on AHRI Standard 1230, the VRF Operations Manual, and DOE's federal test procedure.


17

The Radiation Engineering Committee met to discuss AHRI Draft Standard 1410P.

  • Contact Tae Kwon for more information.

13

The RBLR/CBLR Boiler Compliance Committee met at AHRI headquarters in Arlington, Va., to develop a report outlining the differences between AHRI's boiler certification programs and DOE's test procedures.

  • Contact Tae Kwon for more information.

12

The HI Technical Committee met at AHRI headquarters in Arlington, Va., to discuss DOE's NOPR for commercial boiler standards and test procedures.

  • Contact Tae Kwon for more information.

The ACIM Engineering Committee met to discuss AHRI Standards 820 and 821.


The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.


11

The Ductless Equipment Engineering Committee Technical Committee met to discuss AHRI Standard 1230.


The ERV Compliance Committee met to update the ERV Operations Manual.


9

The SPVU Engineering Committee met to discuss AHRI Standards 390 and 391.


6

The ERV Guidance and Steering Committee met to discuss outstanding items.


The WH Compliance Committee met to discuss RWH and CWH Operations Manual revisions.


5

The ERV Engineering Committee met to discuss AHRI Standards 1060 and 1061.


2

The Liquid Chillers Engineering Committee and Lab Subcommittee met at the Hyatt Regency in Reston, Va., to finalize the presentation focusing on the revised rating requirements in AHRI Standards 550/590 and 551/591.


April 2016

29

The Transportation Refrigeration Compliance Committee met to continue working on data sheets.


The ACIM Engineering Committee met to discuss AHRI Standards 820 and 821.


28

The RTL Compliance Committee met to discuss the new RTL directory template.


The Working Group of Standard 700 Subcommittee met to discuss AHRI Standard 700.


The Refrigerant Regulatory Committee met to discuss comments in response to the proposed ECCC regulations on HFCs.


The Packaged Terminal Engineering Committee met for its bimonthly meeting to address standards work and outstanding items.


Furnace Lab Subcommittee.


The AHUC Engineering Committee and OM Working Group met to discuss the effect of casing design pressure on leakage and deflection testing results.


27

The ERV Compliance Committee met to update the ERV Operations Manual.


The AHU Compliance Committee met to discuss custom units.


26

ULE Engineering Committee.


The Radiation Engineering Committee met to discuss AHRI Standard 1410P.

  • Contact Tae Kwon for more information.

The Ductless Equipment Engineering Committee Technical Committee met to discuss AHRI Standard 1230.


25

Furnace Compliance Committee.


The Ductless Equipment Engineering Committee Technical Committee met to discuss AHRI Standard 1230.


22

The Ductless Equipment Engineering Committee Technical Committee met to discuss AHRI Standard 1230.


ULE Compliance Committee.


21

The ERV Engineering Committee met on to discuss AHRI Standards 1060 and 1061. 


20

The 410 Working Group met to discuss AHRI Standard 410. 


The Liquid Chillers Product Section met to draft a response to the EPA's proposed rulemaking under the SNAP program.


The BFM Engineering Committee met to discuss AHRI Guideline G.


19

The Radiation Engineering Committee met to discuss AHRI Standard 1410P.

  • Contact Tae Kwon for more information.

The WH Technical Committee met to discuss updates on DOE rulemakings and TC working groups.


The ERV Uncertainty Ad Hoc Working Group met to address outstanding items.


18

The Burners Biodiesel Subcommittee met to discuss high biodiesel blends of fuel oils.


The Wind Task Force met to discuss AHRI Standard 1310P.


15

The Furnace Compliance Committee met to discuss testing diversification and the RFRN and CFRN Operations Manuals.


The Liquid Chillers Systems Subcommittee met to begin work on the product section’s strategic plan in response to the Systems Steering Committee.


The ACIM Engineering Committee met to discuss AHRI Standards 820 and 821.


14

The Refrigerant Regulatory Committee met to prepare for AHRI's Spring Meeting.


13

The Standard 930P Advisory Group met to discuss AHRI Standard 930P.


The Radiation Engineering Committee met to discuss AHRI Standard 1410P.

  • Contact Tae Kwon for more information.

ULE Compliance Committee.


The ERV Compliance Committee met to update the ERV Operations Manual.


The Guideline Q Subcommittee met to discuss Guideline Q.


12

The Liquid Chillers Lab Subcommittee met to create a presentation focusing on the revised method of test in AHRI Standards 550/590 and 551/591.


11

The RFC Compliance Committee met to discuss updates in the RFC certification program.


8

The Liquid Chillers Engineering Committee met to discuss AHRI Standards 550/590 and 551/591.


7

The UVNT Compliance Committee met to discuss updates in the UVNT certification program.


The WSHP Engineering Committee met for its bimonthly meeting to address standards work and agenda items.


The ERV Engineering Committee met to discuss AHRI Standards 1060 and 1061.



6

The ERV Uncertainty Ad Hoc Subcommittee met to discuss how to present uncertainty data.


The Radiation Engineering Committee met to discuss AHRI Standard 1410P.

  • Contact Tae Kwon for more information.

The SPVU Engineering Committee met for its bimonthly meeting to address standards work and agenda items.


The AHU Engineering Committee met to discuss custom AHUs.


4

The DX Working Group met to discuss refrigerant coils.


1

The LLHE Compliance Committee met to discuss an implementation date for the LLHE Operations Manual.


March 2016

31

The WSHP Lab Qualification Subcommittee met to discuss Phase 2 correlation.


The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.


The Hydronics Institute Technical Committee met to review the DOE rulemaking on revised test procedures for residential furnaces and boilers.

  • Contact Tae Kwon for more information.

30

The RFC Compliance Committee met to discuss updates to the certification program.


The AHU Compliance Committee met to discuss the definitions for custom AHUs.


29

The Boilers Subsection met to discuss the DOE NOPR to review efficiency standards for commercial boilers.

  • Contact Tae Kwon for more information.

28

The Ductless Equipment Engineering Committee Technical Committee met to discuss AHRI Standard 1230.


The CRR Communications Ad Hoc Committee met to review the new regulatory support website.


The TSE Product Section met to discuss next steps on the white paper and draft research proposal.


The Furnace Compliance Committee met to discuss testing diversification and review the Operations Manual.


24

The ERV Uncertainty Ad Hoc Subcommittee met to discuss uncertainty analysis.


22

The FCCPS Engineering Committee met to review AHRI Standards 750 and 751.


21

The ACHC DX Working Group met to discuss DX coils.


The USE Engineering Committee Ad Hoc Committee met to review fault codes.


17

The SPVU Compliance Committee met to discuss certification activities.


16

The Mobile Refrigeration Nominating Committee met to discuss nominees.


The WSHP Compliance met to discuss certification activities.


14

The Furnace Compliance Committee met to discuss testing diversification.


11

The ULE Compliance Committee met to review the Operations Manual, international rating conditions, and regulations.


10

The Furnace Engineering Committee met  to discuss regulations, fuel gas codes, test procedures, and research projects.


The Ultraviolet Light Treatment Engineering Committee met to discuss AHRI Proposed Standards 1510P and 1511P.


The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.


9-10

The Ductless Equipment Engineering Committee Technical Committee met at AHRI headquarters in Arlington, Va., to revise AHRI Standard 1230.


9

The BFM Nominating Committee met to discuss nominees.


The ACEC Taskforce met to define commercial and industrial ACEC equipment.


The Packaged Terminal Compliance Committee met to discuss certification activities.


The Radiation Engineering Committee met to discuss AHRI Proposed Standard 1410P.

  • Contact Tae Kwon for more information.

The ACHC 410 Working Group met to discuss AHRI Standard 410.


7

The USE Engineering Committee Ad Hoc Committee met to develop a common set of fault codes for on-board diagnostics in HVAC equipment.


The HI Technical Committee met to review the DOE NOPR to revise test procedures for commercial boilers.

  • Contact Tae Kwon for more information.

4

The LLHE Compliance Committee met to discuss comments from an internal audit.


The Guideline Q Subcommittee met to discuss Guideline Q.


The Boiler Compliance Committee met to discuss possible changes to the RBLR certification program.

  • Contact Tae Kwon for more information.

The ACDD Engineering Committee met to discuss research activities.


2

The Software Working Group met to discuss ERV software.


1

The Liquid Chillers Engineering Committee met to create a presentation explaining the main changes in the 2015 version of AHRI Standards 550/590 and 551/591.


February 2016

29

The Unitary Joint Working Group met to restructure the USE, ULE, and Ductless Equipment Product Sections.


26

The Transportation Refrigeration Compliance Committee met to discuss the Operations Manual.


25

The Refrigeration Regulatory Committee met at AHRI headquarters in Arlington, Va., to discuss regulatory activities.


The Ductless Equipment Engineering Committee Technical Committee met to revise AHRI Standard 1230.


The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.


24

The Commercial Refrigeration Product Section met at AHRI headquarters in Arlington, Va., to work on finalizing the sub-structure of the newly updated section.


The Radiation Engineering Committee met to discuss AHRI Proposed Standard 1410P.

  • Contact Tae Kwon for more information.

The Fan Powered Chilled Water Terminal Ad Hoc Committee met to update the scope of the VAV subsection.


The ACHC 410 Working Group met to discuss AHRI Standard 410.


The ULE Compliance Committee met to discuss regulations and international rating conditions.


22

The ACHC DX Working Group met to discuss DX coils.


The DGX Engineering Committee met to discuss AHRI Standards 870 and 871.


 19

The Chillers Lab Subcommittee met to create a presentation explaining the main changes int he 2015 version of AHRI Standards 550/590 and 551/591.


The HI Product Section met to review the DOE final rule for residential boiler efficiency standards.


17

The ACHC 410 Working Group met to discuss AHRI Standard 410.


The Ductless Equipment Product Section met to discuss DOE certification of VRF equipment and the import declaration rulemaking.


12

The ACIM Engineering Committee met to discuss application ratings and white papers.


11

The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.


The CIFAH Engineering Committee met to discuss the Direct Fired Data Model Calculator for ASHRAE 205P and the development of test procedures for CIFAH products.

  • Contact Tae Kwon for more information.

8

The ACB Compliance Committee met to discuss possible revisions to the certification program.


5

The Standard 700 Subcommittee Working Group met to discuss AHRI Standard 700.


The Guideline V Subcommittee met to discuss AHRI Guideline V.


The Hydronics Institute Product Section met to review the DOE final rule for residential boiler efficiency standards.


4

The Ductless Equipment Engineering Committee Technical Committee met to discuss AHRI Standard 1230.


The Radiation Engineering Committee met to discuss AHRI Standard 1410.


The WSHP Compliance Committee met to finalize Operations Manual revisions.


The SPVU Engineering Committee met to discuss AHRI Standards 390 and 391.


2

The Technical Committee on Sound met to discuss AHRI Standards 260 and 261.


January 2016

29

The ACIM Engineering Committee met to discuss application ratings and white papers.


28

The Radiation Engineering Committee met to review AHRI Standard 1410.


25

The USE Engineering Committee Certification Subcommittee met in Orlando, Fla., to discuss barometric pressure corrections.


21

The AHUC Engineering Committee met to review the AHR Expo presentation.


19

The Guideline V Subcommittee met to discuss Guideline V.


The ACHC Compliance Committee met to discuss directory updates.


The Standard 700 Subcommittee met to discuss setting a limit for chlorinated species and R-40 within the standard.


The Electrical Standardization Subcommittee met to discuss AHRI Standard 110.


18

The CRR Product Section and Standard 740 Subcommittee met to organize comments on the EPA CAA Section 608 Proposed Rule.


15

The Liquid Chillers Product Section met to discuss regulatory activities and updates to the certification Operations Manuals.


The Fluid Pumps Product Section met to discuss restructuring the section.


The WH Lab Evaluation Working Group met to develop RWH testing guidelines.


14

The Chilled Beams Engineering Committee met to review the AHR Expo presentation on chilled beams.


The Chillers Lab Subcommittee met to discuss AHRI Standards 550/590 and 551/591.


The AHUC Engineering Committee met to discuss AHRI Standards 430 and 431, and the AHR Expo presentation.


The Standard 1231P Working Group met to discuss AHRI Draft Standard 1231P.


13

The ACHC 410 Working Group met to discuss AHRI Standard 410.


12

The ACHC Compliance Committee met to discuss certification and standard updates.


11

The USE Engineering Committee Certification Subcommittee met to discuss off-cycle watt measurement strategies.


The DX Working Group met to discuss DX Coils.


The ACEC Task Force met to define commercial and industrial ACEC equipment.


The BFM Engineering Committee met to discuss Guideline G.


The Humidifiers Engineering Committee met to discuss AHRI Standard 640 and review items from Annual Meeting.


The ACDD Engineering Committee met to discuss certification, policy, and research activities.


7-8

The Ductless Equipment Engineering Committee Technical Committee met at AHRI headquarters in Arlington, Va., to discuss AHRI Standard 1230.


7

The UVLT Engineering Committee met to discuss AHRI Standards 1510P and 1511P.


6-7

The Liquid Chillers Product Section met at AHRI headquarters in Arlington, Va., to discuss section standard, regulatory, and certification activities.


6

The ACB Compliance Committee met to discuss clarification for BMG definitions, directory listings, and witness test procedures.


5

The VRF Compliance Committee met to review the VRF certification program rules and provisions.


The Compressor Performance Uncertainties Working Group met to continue work on the white paper.


December 2015

21

The Chilled Beams Engineering Committee met to review the 2016 AHR Expo presentation on active chilled beams.


18

The ACEC Taskforce met to define the scope of industrial and commercial ACEC products.


17

The TCoS 375 Subcommittee met to discuss AHRI Draft Standard 375P.


The ACIM Engineering Committee met to discuss AHRI Standard 810.


The LLHE Compliance Committee met to discuss action items from Annual Meeting.


The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.


The AHUC Engineering Committee met to discuss the AHR Expo educational seminar on AHRI Standard 1350.


16

The ACHC 410 Working Group met to discuss AHRI Standard 410.


15

The Ductless Equipment Engineering Committee Technical Committee met to discuss AHRI Standard 1230.


14

The DX Coils Working Group met to continue discussing DX coils.


The UC Compliance Committee met to review the Operations Manual.


The WH Lab Evaluation Working Group met to develop RWH and CWH testing guidelines.


7-8

The RFC Engineering Committee met at AHRI HQ to discuss AHRI Standard 440.


4

The Ductless Equipment Engineering Committee met to discuss DOE SNOPR comments.


3

The Ductless Equipment Engineering Committee Technical Committee met to discuss AHRI Standard 1230.


The MEAF Engineering Committee met to discuss AHRI Standards 680 and 681.


2

The ACHC 410 Working Group met to discuss AHRI Standard 410.


1

The RFC Engineering Committee met to discuss AHRI Standard 440.


The Joint RBLR/CBLR Boiler Compliance Committee met at AHRI headquarters in Arlington, Va., to review and revise the RBLR Testing Guidelines.

  • Contact Tae Kwon for more information.

November 2015

30

The Compressor Performance Uncertainties Working Group met to continue work on the white paper.


The DX Coils Working Group met to continue discussing DX coils.


The HPPH Engineering Committee met to discuss comments to the DOE NODA.


23

The WH Lab Evaluation Working Group met to develop RWH and CWH testing guidelines.


The AHU Engineering Committee met to review the final draft addendum and vote to send to CSS for approval.


20

The Ductless Equipment Engineering Committee Technical Committee met to discuss AHRI Standard 1230.


The WH Technical Committee met to review the draft DOE guideline on RWH test procedures.


19

The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.


18

The ACHC 410 Working Group met to discuss AHRI Standard 410.


12

The WH Lab Evaluation Working Group met to develop RWH and CWH testing guidelines. 


The RFC Engineering Committee met to discuss AHRI Standard 440.


The AHU Engineering Committee met to discuss AHRI Standard 430.


The AHUC Engineering Committee met to discuss an educational seminar on AHRI Standard 1350.


10

The Guideline N Subcommittee met to discuss Guideline N. 


The USE Engineering Committee Ad Hoc Committee met to develop a common set of error codes for on-board diagnostics in HVAC equipment.


9

The AHU Compliance Committee met to finalize work on the Operations Manual. 


The Infrared Heaters Product Section met to discuss a potential certification program for infrared heaters using CAN/ANSI/AHRI Standard 1330.


The Direct Expansion Coils Working Group met to determine a work plan. 


6

The ACIM Compliance Committee met to discuss self-contained units. 


The Infrared Heaters Engineering Committee met to discuss AHRI Standard 1330P and the ASHRAE Handbook. 


The Boiler Compliance Committee met to discuss revisions to the RBLR Operations Manual. 


The ACHC 410 Working Group met to discuss AHRI Standard 410. 


The Burners Biodiesel Subcommittee met to discuss high biodiesel blends of fuel oils. 


The USE Engineering Committee Ad Hoc Committee met to develop a common set of error codes for on-board diagnostics in HVAC equipment. 


5

The RFC Engineering Committee met to discuss AHRI Standard 440.


The Ductless Equipment Product Section met to discuss restructuring the working group.


The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.


The Guideline Q Subcommittee met to discuss Guideline Q.


The ULE Engineering Committee met to discuss AHRI Standard 340/360.


4

A discussion of AHRI Draft Standard 1231P was held with the Newport Partners.


2

The Joint RBLR/CBLR Compliance Committee met to discuss revisions to the RBLR Operations Manual and testing guidelines.

  • Contact Tae Kwon for more information.

The WH Lab Evaluation Working Group met to develop RWH and CWH testing guidelines.


October 2015

30

The USE Compliance Committee Ad Hoc Committee met to develop a proposal for DOE basic model.


29

The Compressor Performance Uncertainties Working Group met to continue work on the compressor performance uncertainties white paper.


The Radiation Engineering Committee met to discuss AHRI Draft Standard 1410.


The AHU Engineering Committee met to discuss AHRI Standard 430.


28

The ACHC 410 Working Group met to discuss AHRI Standard 410.


The CRR Communications Ad Hoc Committee met to review the AHRI regulatory support website.


27

The AHU Compliance Committee met to discuss revisions of the Operations Manual to incorporate fan arrays.


26

The ULE Product Section met to discuss the development of a ULE Systems Strategic Plan.


23

The USE Compliance Committee Ad Hoc Committee met to develop a proposal for DOE basic model.


22

The RFC Engineering Committee met to discuss AHRI Standard 440.


The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.


The Technical Committee on Sound met to discuss AHRI Standards 270 and 300.


21

The ACHC Engineering Committee met to review AHRI Standard 410.


The ACDD Joint Compliance and Engineering Committees met to discuss presentation for the CP&P Committee.


20

The AHU Compliance Committee met to review the AHU Operations Manual.


19

The ACHC Compliance Committee met to update the ACHC Operations Manual.


16

The LLHE Compliance Committee met to discuss marketplace scenarios.


15

The HI Nominating Committee met to nominate Boiler and Radiation Subsection officers.


The Standard 740 Subcommittee met to discuss AHRI Standard 740.


The AHU Engineering Committee met to discuss AHRI Standard 430.


The IWH Compliance Committee met to review testing guidelines for Indirect Water Heaters.


14

The Furnace Compliance Committee met to discuss testing diversification, and the RFRN and CFRN certification programs.


The ACIM Engineering Committee met to discuss AHRI Standard 810 and a draft white paper.


The Standard 700 Subcommittee Working Group met on to continue revision Appendix C.


The ACHC 410 Working Group met to discuss AHRI Standard 410.


13

The USE Engineering Committee Ad Hoc Committee met to develop a common set of error codes for on-board diagnostics in HVAC equipment.


The BFM Engineering Committee met to discuss Guideline G.


12

The WH Controls Working Group met on to review proposed revisions to ANSI Z21/CSA Water Heater safety standards.


The FCCPS Product Section met to discuss section chairmanship.


9

The ACCL and WCCL Compliance Committees met at AHRI headquarters to discuss certification program testing, procedure, and scope.


The Radiation Engineering Committee met to discuss AHRI Draft Standard 1410.


The Technical Committee on Sound met to discuss AHRI Standards 260 and 261.


The VRF Compliance Committee met to discuss Title 24 CBECC-COM software development.


8

The ACCL and WCCL Compliance Committees met at AHRI headquarters to discuss certification program testing, procedure, and scope.


The HI Technical Committee met to discuss ENERGY STAR specifications.

  • Contact Tae Kwon for more information.

The RFC Engineering Committee met to discuss AHRI Standard 440.


7

The ACDD Compliance Committee met to discuss a presentation to the CP&P Committee.


The Burners Biodiesel Subcommittee met to discuss high biodiesel blends of fuel oils.


The Liquid Chillers Engineering Committee and Lab Subcommittee met at AHRI headquarters to discuss AHRI Standards 550/590 & 551/591.


The ACHC 410 Working Group met at AHRI headquarters to finalize revisions to AHRI Standard 410.


6

The Liquid Chillers Engineering Committee and Lab Subcommittee met at AHRI headquarters to discuss AHRI Standards 550/590 & 551/591.


The ACHC 410 Working Group met at AHRI headquarters to finalize revisions to AHRI Standard 410.


1

The LLHE Compliance Committee met to discuss the program scope. 


The AHU Engineering Committee met to discuss AHRI Standards 430 and 431.